top of page

Lateral Earth Pressures
Lateral earth pressures are the forces exerted by soil that are not strictly vertical. These can be measured directly, however, more often they are estimated by a knowledge of soil index or strength properties. They are needed for the design of retaining walls, shoring, deep foundations, slopes, and other structures.
bottom of page