top of page

Geotechnical Review
A Geologic or Geotechnical Review is the reviewing of available data about a soil and rock conditions on a property such as engineering and architectural documents, geologic maps, soil maps, aerial photographs, topographic maps, geologic hazard maps, etc.
bottom of page