top of page

Geotechnical Fieldwork
Geologic or Geotechnical Fieldwork are referring to activities such as soil and rock sampling drilling or excavations, creating field logs of exploratory excavations, geologic mapping, photographic documentation, construction quality control testing and special inspections, obtaining site measurements and elevation data, collecting soil samples for laboratory analysis, etc.
bottom of page