top of page
  • Instagram
  • LinkedIn
KOW Building Consultants_0827-BW.jpg

Freddie Mac Property Condition Report

Freddie Mac and its DUS Lenders have specific requirements for their version of the Property Condition Report. The Freddie Mac Property Condition Report scope of work, as specified in the Freddie Mac Multifamily Seller/Servicer Guide and Chapter 15 Engineering and Property Condition Requirements, is similar to an ASTM E2018 Property Condition Assessment, but also has distinct differences.

bottom of page