top of page

Corrosion Testing
Corrosion Testing is an Analytical test of resistivity, pH, chlorides and sulfides that are commonly performed on geotechnical projects. These check the chemical reactivity between the soil and the two most common building materials, such as steel, metal pipes, and concrete.
bottom of page