top of page
  • Instagram
  • LinkedIn
KOW Building Consultants_0827-BW.jpg

Building Inspection

A Building Inspection for a commercial real estate property in the European Union (EU) or the United Kingdom (UK) — also known as Property Condition Assessments (PCAs) in the U.S., and Building Condition Assessments (BCAs) in Canada — is a comprehensive evaluation of the building’s condition. It’s crucial to ensure the property meets all legal requirements and adheres to relevant safety standards. A qualified inspector will conduct a detailed visual inspection of the building’s structure, major systems (electrical, plumbing, HVAC), and common areas. The inspection may also involve reviewing relevant building codes and permits.
Building Inspections are essential for various reasons.  For potential buyers, an inspection helps identify any potential problems with the property that could lead to costly repairs or renovations down the line. This information is vital for informed investment decisions. For property owners, inspections can uncover hidden issues that could pose safety hazards or lead to operational disruptions. Addressing these issues proactively can save money in the long run and minimize risks.

bottom of page