top of page
KOW Building Consultants_0095-BW.jpg

SUSTAINABILITY TEAM

Jared Forman.PNG

Jared Forman

Director of Sustainability

  • LinkedIn
Brandon.Lopez.jpg

Brandon Lopez

BPI MFBA, LEED GA,
Director of Integrated Physical Needs 

  • LinkedIn
Nancy Ryan_edited.jpg

Nancy Ryan

 Sustainability Operations Manager

  • LinkedIn
AriSokolov_Headshot.jfif

Ari Sokolov

Sustainability Consultant

  • LinkedIn
Elaria Turton.jpg

Elaria Turton

Sustainability Consultant

  • LinkedIn
IMG_5462.JPG

Hameed Cornelius

Senior Sustainability Consultant

  • LinkedIn
headshot 2.jpg

Nick Gilmore

Sustainability Analyst

  • LinkedIn
IMG_6476.jpeg

Gillian Macchia

Sustainability Analyst

  • LinkedIn
Alex Stickler Headshot.PNG

Alexandra Stickler

Sustainability Analyst

  • LinkedIn
bottom of page